Large-scale coal mine requests to renew permit in the Laurel Highlands

Community invited to submit public comment on Rustic Ridge Coal Mine Renewals

Comment Deadline: November 24, 2026

Rustic Ridge #1 CMAP (CMAP 65131301) and NPDES (NPDES PA0236241) Permit Renewal

Written comments can be mailed to DEP’s California District Mining Office, 25 Technology Criver, Coal Center, PA 15423. Comments may also be emailed to Lori Jenkins at lorjenkins@pa.gov

A massive coal mine continues to impact the heart of the Laurel Highlands as it seeks operating permit renewals. Since 2018, LCT Energy, a subsidiary of Latrobe based Robindale Energy has been actively mining underground in the Donegal and Acme areas. The original bounds of the mine sought to extract an area of around 2,800 subsurface acres, but in 2024 the company amended the original permit by adding an additional 1,400 acres into the headwaters of Fourmile Run, a tributary to Loyalhanna Creek. Now, in accordance with the 5 year permit calendar, the company is seeking to renew its coal mine activity permit (CMAP 65131301) and National Pollutant Discharge Elimination Permit (NPDES PA0236241) permit which controls what the mine releases into Champion Creek. The current permits expire December 22, 2026. 

On November 10 the Pennsylvania Department of Environmental Protection (PADEP) California District Mining Office hosted an informal public conference as part of the public process surrounding industrial permitting. The event came after MWA hosted a well attended community town hall and information session regarding the details of the permit renewal on November 5. 

During the public conference, PADEP offered information that outlined the details of the departments review, summarized details of the permit materials, supported a question and answer session between the public and department, offered an open house style segment where folks can review the details of the mining bounds along with ask specific questions to DEP permit review team. 

Numerous concerns and questions were raised including water quality and cumulative pollution impact in precious waters of the Laurel Highlands, concerns over potentially inaccurate drill log, 

Mining has already damaged nearby properties, and planned flooding could cause more damage after the mine closes. MWA has also discovered missing geological records, raising questions about whether nearby homes and buildings are protected. There are also concerns about water pollution and who will pay for cleanup after mining ends.

Between 2020 and 2022, the ground sank under at least five homes above the mine, and LCT bought three of the impacted properties for at least $1.55 million total. LCT’s own engineers found that coal pillars holding up the ground sank into soft rock below. Their report noted the same weak rock in other parts of the mine, yet DEP approved the 2025 expansion before seeing the full study. Meanwhile, LCT’s own tests show rising levels of sulfate and dissolved solids in the mine water going into Champion Creek. Even so, LCT’s cleanup bond sets aside zero dollars to treat that water after the mine closes. 

The mine has about seven more years of anticipated operation. Upon closure the operations will shift to retiring infrastructure and sealing areas with an unknown fill. One of the final stages includes reintroducing the naturally occurring hydrologic cycle that creates aquifers and surface waters to flood the remaining voids. 

What happens next is a story of clean water insecurity that this area has known for well over a century since mining began in the area. Of top concern is the potential for underground interaction with long abandoned mines that contribute to the over 100 AMD seeps in the Indian Creek Valley. 

Residents, business owners, and visitors alike are requested to submit a comment to PADEP on the renewals. If you’d like to go on record to protect this special watershed that supports life, economy, and opportunity for all generations to thrive, send a comment to PADEP by November 24, 2026. 

Here are five important concerns community members may want to raise to the PADEP:

1. Mining Has Already Caused Property Damage

Between 2020 and 2022, at least five homes experienced subsidence, which happens when underground mining causes the ground to sink. Damage was so severe that LCT purchased three affected properties for at least $1.55 million total.

LCT hired Barr Engineering to investigate the cause. Engineers found that coal pillars left underground to support the ground above were sinking into weak rock beneath them.

  • Barr identified similar conditions elsewhere in the mine, raising concerns about potential for future damage.

DEP approved the April 2025 mine expansion without ever seeing Barr’s full report. LCT submitted only a partial summary that left out important findings, including warnings about increased risks in the future.

DEP did not receive the full report until after approving the 2025 expansion. DEP has not asked LCT for any additional changes since then. 

Before approving this permit renewal, DEP should require complete sets of accurate information about the underground conditions that led to subsidence and whether they exist elsewhere in the permit boundary.

2. Flooding Could Cause Even More Damage

During operations, LCT pumps water out of the underground mine void, so people and equipment can safely access and work there.  As part of its plan to prevent acid mine drainage, LCT says it will let water fill the mine voids completely after mining ends (according to LCT’s permit documents, that is planned to be around 7 years from now). LCT claims the underground voids will fill completely with underground water, which will help prevent acid mine drainage. This is because acid mine drainage only forms when water and oxygen react with a mineral called pyrite.

But the water could also cause a problem. After mining, the company leaves behind pillars of coal that hold up the ground. Barr Engineering found subsidence happened when pillars sank into the soft clay under them. Barr also noted the same kind of soft clay in other parts of the expansion area. Barr concluded that the already soft clay will also lose 40–60% of its strength after it has been soaked by the flooding mine water.

This means additional ground sinking could occur, causing property damage to homes – possibly many years after the mine closes.

3. LCT Submitted Incomplete Geological Records To DEP

In MWA’s review of LCT’s records expansion area, we uncovered key information that was never submitted to DEP:

  • Missing geological details: Original records described weak and broken rock, cracks, unstable roof layers, and pyrite – all of which can contribute to acid mine drainage. These details were left out of records submitted to DEP.
  • Eleven missing drill-hole records: DEP did not receive geology logs for eleven drillholes describing underground conditions.
  • Missing information on maps: After mining caused the ground to sink and damage homes, DEP required LCT to identify soft mine floors on maps that must be submitted every six months. LCT still has never identified those conditions, even though DEP inspectors have documented weak floors in the permit area, which Barr Engineering also identified. Without this information, DEP may miss areas at risk of sinking.
  • DEP authorized mining in an additional 52.5-acre area, including beneath St. Raymond’s Church, without conducting any additional analysis of subsidence risks or requiring site-specific geological data from LCT.

DEP needs complete, accurate information to determine whether the mine can safely support the ground above and prevent acid mine drainage.

5. Who Will Pay for Polluted Mine Water After Mining Ends?

Mine water from Rustic Ridge #1 is already worsening and has to be treated before it goes into Champion Creek. But LCT’s renewal application does not include money to treat that water after the mine closes.

  • Water quality is already a concern. Testing has shown rising levels of sulfate and other dissolved substances. Increases in selenium were so high that DEP added new limits for it, since it can harm aquatic life.
  • LCT predicts mine water will stay underground after closure:
    • LCT says no treatment will be needed after the mine closes because all the water will stay in the mine and never flow into nearby streams. 
  • LCT assumes that the mine floor and roof are solid enough to hold the water in the mind void. But in the records DEP never got to review, LCT describes weak floors and broken, cracked roof rock which can open paths for mine water to escape.
    • Any future sinking or failing pillars would also add to the problem.
  • We have seen what happens when mines leave behind polluted water. Many abandoned mines in our region still need treatment over 100 years later, and will forever. The companies responsible are often long gone, leaving taxpayers and nonprofits to pay.
  • LCT has not included future treatment costs in its proposed cleanup bond. A bond provides money or other financial protection for cleanup if the company fails to do the work. But under Pennsylvania law, paying for treatment does not make pollution legal.
    • If DEP believes the mine will cause a polluting discharge, it must deny the permit.

If LCT’s predictions are wrong, taxpayers could be stuck paying millions of dollars for treatment. Given the area’s history of mine discharges, DEP should require enough financial protection to cover future treatment if needed. If treatment proves unnecessary, that protection can be released under the applicable rules.

6. Water Pollution Discharge Concerns

  • The current permit has no cap on how fast mine water is discharged into the creek. In a 2018 legal agreement with MWA, LCT promised to limit discharge to no more than 1,000 gallons per minute.
    • DEP incorporated the limit into LCT’s permit but later removed it during the 2024 renewal process. Now there is no discharge limit, and LCT is only required to monitor and report the flow rate.
    • The limited flow is critical to lower the risk of flooding and protect aquatic habitats that rely on a predictable flow to lay eggs or otherwise survive. LCT is already legally bound to the limit, so there is no reason for DEP to refuse to enforce it.
  • Downstream water quality is worsening:
    • LCT’s own tests show that, every year since 2023, Champion Creek just below the mine outfall has had more than double the sulfate of the creek just above it.
    • Dissolved solids in the discharge have risen over the past five years, and the most recent round of testing in early 2026 ran higher than any previous year. 
    • The permit sets no limit on either one — LCT only has to report the numbers
  • We asked for stricter limits and more frequent testing in 2024 — DEP said no. MWA asked DEP to tighten limits on pollutants like iron, manganese, and selenium, and to require daily testing instead of twice a month. DEP kept the same limits and schedule.
    • Testing only twice a month means LCT picks the days – a bad day can go unrecorded. Stricter limits and daily testing would let DEP catch problems when they happen, not months later. 

Community members can ask DEP to:

  • Evaluate the complete Barr Engineering report data sets they prepared, and require additional protections to address the findings.
  • Require LCT to provide complete, accurate drilling records and maps so DEP can evaluate whether the mine can safely support the ground above, including after flooding.
  • Explain how nearby homes, St. Raymond’s Church, and water resources will be protected.
  • Ask DEP to do a thorough reevaluation of whether the floor and roof can prevent an acid mine discharge after closure 
  • Ensure enough financial protection is in place to cover long-term water treatment if necessary.
  • Require and enforce additional monitoring and appropriate safety measures to prevent future damage.

Beyond this deadline followers can stay tuned for an informal public conference on an acreage swap request within the permitted mine boundary and a formal public hearing on this same NPDES Permit. 

If you have any questions call us at 724-455-4200, or email Stacey@mtwatershed.com with questions!